01
Connect
Cloud portals and edge Modbus/MQTT normalize into one fleet-wide operating record.
For mini-grid operations leaders and EPC/O&M service teams: connect site alerts, technician work and the evidence needed to review a repair. Decide what needs attention and keep responsibility clear through the handover.
Review site alerts and their context to decide which issue needs investigation next.
Fuel and runtime are measured against each site's own approved, operating-condition-adjusted baseline.
Assign work with diagnostic context and review returned findings. Approval and equipment execution remain separate.
Supported vendor portals and commissioned edge devices feed a shared metric vocabulary. Group related symptoms, inspect delivery and trust coverage, and carry the evidence into work orders and follow-up.
Inverter drift — inspect the supporting evidence
09:41 WATBattery cell divergence above baseline
08:17 WATSoiling indicator — review cleaning conditions
06:55 WATReview the issue, assign responsibility and follow the field response. The timeline shows the handoffs between people and records, with approvals and equipment commands recorded as separate steps.
Related equipment alerts are grouped for investigation.
Review the evidence and proposed response. Commands and approvals remain distinct.
Coordinate the work order and retain the technician's recorded findings.
Assess attached records. Missing evidence remains visible.
Where enabled, review post-repair findings separately from field completion. Human review is not independent certification.
Follow detection, review, assignment and observed findings in one record. This is not an autonomous response or a measured resolution time.
Technician
Keep the work and its evidence together.
Record the cause, action, parts and photos against the job. Offline updates queue on the device and sync once the server accepts them.
Record integrity
A matching record hash proves the sealed content has not been altered since the technician filed it.
Evidence processing
See what supports the repair record.
Inspect the evidence assessment and missing items. Later evidence can receive a new assessment without rewriting the sealed record.
Evidence quality
A zero score means an assessment ran and found no qualifying support — which is not the same as a record nothing has assessed yet.
Configured evaluation
Look at what happened afterwards.
Check whether the monitored signs of the fault cleared and whether it returned. See how each finding was assessed, over what period, and how much expected data arrived and passed validity checks.
Observed outcome
A completed evaluation is not the same as a successful repair, and the result tells you which one you are looking at.
Authorised owner or admin
Keep the reviewer and their basis on record.
See who reviewed the repair record, what they considered and whether they accepted or disputed it.
Human review
The review retains its reason and the version inspected. Unreviewed records remain identifiable; the underlying assessment stays separate.
Record integrity, repair findings and supervisor review are separate checks—not independent certification. Follow-up evaluation and supervisor review require enablement, suitable evidence and role permissions; confirm availability during discovery.
01
Cloud portals and edge Modbus/MQTT normalize into one fleet-wide operating record.
02
Alerts are grouped, suppressed, deduplicated, and ranked by operating impact.
03
Review recommendations, approve authorised actions and coordinate field work.
04
Keep field evidence, post-repair findings and human review distinct.
Three workflows for the NERC 2026 obligations: operational and commercial reporting, loss evidence, and interconnected settlement. Each prepares evidence for a person to check and sign. Gen318 does not file with a regulator, certify a loss, or settle a payment.
Connect or import authorised records
Review gaps and exceptions
Approve the evidence record
Export for authorised review
For mini-grid operators and reporting teams.
For operators preparing a loss assessment with an engineer or independent reviewer.
For interconnected mini-grid commercial teams reconciling with a distribution partner.
Regulatory sources checked 15 September 2026: NERC Mini-Grid Regulations 2026, sections 22–24 and official Schedules 4, 8 and 10. Applicable state instruments and project approvals must be reviewed separately.
Equipment fit depends on supported signals, access and commissioning. SparkMeter remains a metering partner and Odyssey a programme partner. Reporting preparation does not imply automatic NERC filing or regulatory approval.
Victron VRM, SparkMeter and Koios, Huawei FusionSolar, and Growatt cloud adapters normalize into the same metric model.
Gen318 adapter registrySavings are calculated only when the site has an active baseline and sufficient measurement evidence; operating conditions can adjust the comparison.
Gen318 diesel M&VAsk and Operations Desk require enablement. Equipment actuation is separately gated and off by default.
Deployment availabilityPhysical control needs the configured execution path and current safety checks. A proposal approval does not establish equipment execution.
Gen318 dispatch safety planeCollection, local inference, and priority queues continue through weak or absent connectivity; critical evidence syncs first when the link returns.
Gen318 edge architectureIncident history, the selected response, technician assignment, field findings, command result, and resolution remain connected.
Gen318 work-order evidenceBring the site issue your team needs to resolve.
Walk through an issue from the first alert to assigned work and the field findings your team reviews.