Inspect an output

Inspect the portfolio behind the headline.

Move from the portfolio summary to coverage, assumptions and the questions to take back to the operator.

Sample scenario · Synthetic data. Riverside Industrial Solar, 31 August–6 September 2026. Generated reports include an interruption and a missing-data window; they are not finalised or independently certified.

Both reports cover 31 August through 6 September: from 31 August 2026 at 00:00 UTC, inclusive, to 7 September at 00:00 UTC, exclusive. The client PDF names that exclusive end boundary; the portfolio PDF names the last included day. Metered delivered energy and AC generation use different source records and aggregation methods; they are not interchangeable totals.

Open the sample PDF →

Three-page PDF. The readable guide below explains the principal fields; the PDF contains the full tables and methodology.

What the figures mean

Portfolio scope
1 site · 50 kW
Riverside Industrial Solar, with the site annex and seven-day performance ledger.
Adjusted / raw availability
96.54% / 96.54%
Adjusted availability removes eligible excused time; raw availability uses all contracted minutes.
AC generation
791.4 kWh
Daily performance-ledger AC generation. It differs from the client statement's meter-counter total because the source and aggregation differ.
Delivered / trusted telemetry
99.4% / 100%
Delivered compares arrivals with expected cadence. Trusted describes accepted arrivals.
Revenue and fuel cost
Unpriced
No tariff or fuel price was supplied. Revenue, when priced, is an energy × tariff proxy; collections and DSCR are not measured.
Battery remaining life
Not evaluated
No battery prediction exists in this scope. Missing evidence is not a zero-day lifetime.

Use the report to ask a better next question.

  • Which sites have incomplete records or unresolved operating risks?
  • Which figures are measured, modelled, unpriced or unavailable?
  • What operator action or supporting record would clarify the next review?

Explore the workflow behind the report.

Source: product revision 9811f3f with local reporting corrections, 7 September 2026. Confirm deployment scope and authorised recipients before using reports operationally. Portfolio access follows memberships; owner finalisation and controlled sharing are separate steps.