Inspect the portfolio behind the headline.
Move from the portfolio summary to coverage, assumptions and the questions to take back to the operator.
Sample scenario · Synthetic data. Riverside Industrial Solar, 31 August–6 September 2026. Generated reports include an interruption and a missing-data window; they are not finalised or independently certified.
Both reports cover 31 August through 6 September: from 31 August 2026 at 00:00 UTC, inclusive, to 7 September at 00:00 UTC, exclusive. The client PDF names that exclusive end boundary; the portfolio PDF names the last included day. Metered delivered energy and AC generation use different source records and aggregation methods; they are not interchangeable totals.
Open the sample PDF →Three-page PDF. The readable guide below explains the principal fields; the PDF contains the full tables and methodology.
What the figures mean
- Portfolio scope
- 1 site · 50 kW
- Riverside Industrial Solar, with the site annex and seven-day performance ledger.
- Adjusted / raw availability
- 96.54% / 96.54%
- Adjusted availability removes eligible excused time; raw availability uses all contracted minutes.
- AC generation
- 791.4 kWh
- Daily performance-ledger AC generation. It differs from the client statement's meter-counter total because the source and aggregation differ.
- Delivered / trusted telemetry
- 99.4% / 100%
- Delivered compares arrivals with expected cadence. Trusted describes accepted arrivals.
- Revenue and fuel cost
- Unpriced
- No tariff or fuel price was supplied. Revenue, when priced, is an energy × tariff proxy; collections and DSCR are not measured.
- Battery remaining life
- Not evaluated
- No battery prediction exists in this scope. Missing evidence is not a zero-day lifetime.
Use the report to ask a better next question.
- Which sites have incomplete records or unresolved operating risks?
- Which figures are measured, modelled, unpriced or unavailable?
- What operator action or supporting record would clarify the next review?
Explore the workflow behind the report.
Source: product revision 9811f3f with local reporting corrections, 7 September 2026. Confirm deployment scope and authorised recipients before using reports operationally. Portfolio access follows memberships; owner finalisation and controlled sharing are separate steps.