{
  "notice": "Sample scenario · Synthetic data",
  "product_source": "9811f3fe97c3f257c16036c6d86d5442211fcf58 with retained reporting, Ask retry and proposal-preview corrections",
  "question": "Give the handover for only “Review interruption source data” and “Investigate inverter output interruption”, excluding the older inspection. In three short sentences: what the completed source-data review found; what remains open; what the saved unapproved proposal asks the operator to check. Cite these two work orders. Refer to “the inverter” without equipment numbers or dates. Do not create another proposal.",
  "answer": "The completed source-data review for the inverter found that the cause of the interruption remains undetermined, and recommends ongoing monitoring [WO:264987d7-12a7-485a-be7e-4d1a5c79c857]. The outstanding item is to investigate the inverter’s output interruption, which is still open [WO:7809fc95-5eb9-4c5d-9289-4c7723c8c2a1]. The saved proposal asks the operator to review the completed source-data assessment, check the inverter’s source readings, and confirm the cause before any repair is advised [WO:7809fc95-5eb9-4c5d-9289-4c7723c8c2a1].",
  "citations": [
    "WO:264987d7-12a7-485a-be7e-4d1a5c79c857",
    "WO:7809fc95-5eb9-4c5d-9289-4c7723c8c2a1"
  ],
  "generated_at": "2026-09-08T11:41:51.712945+00:00",
  "proposal": {
    "id": "b9a11d49-d4a8-4aa4-b77c-f2510843ad04",
    "run_id": "08ff5067-2d58-40d5-98da-fbe727e98c1b",
    "thread_id": "bbe07903-a3bf-4dd3-895a-1f0678e4623c",
    "site_id": "d0000000-0000-0000-0000-000000000002",
    "action_type": "work_order.create",
    "summary": "Create a medium work order at Riverside Industrial Solar: Carry out inverter inspection: reconcile open work order and confirm cause before any repair",
    "preview": {
      "site": {
        "id": "d0000000-0000-0000-0000-000000000002",
        "lga": null,
        "name": "Riverside Industrial Solar",
        "state": "FCT",
        "status": "active"
      },
      "asset": {
        "id": "6f96802b-bd39-48e6-9171-22e104773eca",
        "type": "inverter",
        "model": "Inverter 02",
        "status": "active",
        "manufacturer": "Riverside",
        "serial_number": {
          "value": "INV-02",
          "provenance": "device_reported"
        },
        "firmware_version": null
      },
      "title": "Carry out inverter inspection: reconcile open work order and confirm cause before any repair",
      "effect": "On approval, one work order is created at Riverside Industrial Solar with status 'created' and no technician assigned. Its SLA deadline is computed at creation from the 'medium' priority, and routing and technician notifications run from that creation.",
      "priority": "medium",
      "writes_now": "Nothing. This draft is inert until an approver accepts it; declining it leaves no trace on the work-order queue.",
      "description": "There is already an open work order for Riverside Inverter 02 requiring review of the completed source-data assessment, checks on inverter source readings, and collection of before-and-after field evidence, with confirmation of root cause before recommending a repair [WO:7809fc95-5eb9-4c5d-9289-4c7723c8c2a1]. This inspection proposal consolidates this request and documents the completed source-data review.",
      "idempotency": "No alert link — separate approved drafts can create duplicate jobs.",
      "not_included": "No technician assignment, no parts reservation, no scheduled visit, and no change to the alert that prompted this.",
      "safety_notes": [
        "Lock out inverter AC and DC before opening covers",
        "Use insulated gloves and tools"
      ],
      "linked_alert_id": null,
      "required_skills": [
        "inverter",
        "diagnostics"
      ],
      "suggested_parts": []
    },
    "risks": [
      "If the diagnosis is wrong, a technician drives to a real site for a fault that is not there while the actual fault stays open.",
      "Priority sets the SLA clock and the routing queue — an inflated priority displaces jobs that genuinely are critical.",
      "Suggested parts are drawn from the fault description, not from stock or from the asset's bill of materials; a wrong part turns one visit into two.",
      "The work order created on approval is a real operational record: it notifies people and is cancelled, not deleted."
    ],
    "evidence_ids": [
      "SITE:d0000000-0000-0000-0000-000000000002",
      "ASSET:6f96802b-bd39-48e6-9171-22e104773eca"
    ],
    "influenced_by_untrusted": false,
    "requires_permission": "work_orders:manage",
    "status": "open",
    "expires_at": "2026-09-08T12:13:36.497520+00:00",
    "decided_at": null,
    "decision_reason": null,
    "created_at": "2026-09-08T11:43:36.496414+00:00"
  },
  "execution": "No proposal approved or executed; record states and expiry are historical capture values.",
  "capture_note": "The answer and proposal are from separate turns of the same investigation. Proposal drafting succeeded; its accompanying final prose was withheld by the numeric grounding gate. The displayed answer is the earlier completed, cited handover.",
  "recapture": {
    "notice": "Sample scenario · Synthetic data",
    "captured_at": "2026-09-08T12:29:30.663Z",
    "displayed_proposal_state": "expired",
    "reason": "The retained proposal expired at its recorded expires_at without approval. The original proposal payload below preserves its historical open status.",
    "model_rerun": false,
    "capture_manifest": "capture-manifest.json"
  }
}
